Operations Manual

Logistics and Technical Installation

Following the successful fabrication of your order, this protocol dictates how we manage dispatch, coordinate site-readiness, and execute technical on-site assembly to ensure a flawless handover.

Phase 1: Pre-Dispatch Logistics

Packaging and Transit Protection

All finished components undergo final QA before being wrapped in industrial-grade corrugated packing and edge protectors to prevent powder-coat abrasion during transit.

Dispatch Planning and Site Readiness Verification

Our logistics coordinators verify with your facility manager that the site is clear of civil work, accessible for heavy transport, and ready to receive materials before any dispatch occurs.

Phase 2: On-Site Coordination

Dedicated Fleet Transit

By managing our own logistics network out of Ahmedabad, we avoid third-party freight delays and ensure the furniture arrives safely across Gujarat (Surat, Vadodara, Rajkot, etc.).

Phased and Floor-by-Floor Delivery

For large-scale projects, materials are unloaded and staged precisely where they are needed, minimizing internal site transfer and protecting existing interior fit-outs.

Phase 3: Technical Installation Execution

Structural Anchoring

Heavy-duty industrial racks and institutional storage units are properly aligned, leveled, and mechanically anchored to the floor or walls as required by safety protocols.

Cable Management Integration

Modular workstation spines are assembled with open raceways, allowing your IT contractors to immediately begin laying data and power lines without disassembling the furniture.

Phase 4: Quality Handover

Final Inspection Walkthrough

Our site supervisor conducts a joint walkthrough with the client's representative, verifying that all alignments, locks, and mechanisms function correctly.

Debris Clearance and Site Preparation

All packing materials, corrugated sheets, and installation debris are removed from the workspace, leaving a clean environment ready for immediate occupation.

Post-Installation Support

Following handover, the project enters the warranty phase. Our engineering team provides long-term structural warranties and maintenance guidelines for all commercial installations.

Review Warranty Protocol

Installation FAQs

Do you handle installation for multi-floor corporate offices?

Yes. Our technical teams coordinate with facility managers to execute phased, floor-by-floor installations, allowing completed floors to become operational while work continues elsewhere.

How do you manage potential transit damage?

By utilizing a dedicated logistics network rather than third-party freight forwarders, we maintain chain-of-custody from our Ahmedabad factory floor to your project site, minimizing handling transfers and transit damage.

Is site preparation required before delivery?

Yes. The site must be cleared of construction debris, and heavy civil work must be completed. Our installation teams require safe access pathways and operational service elevators for multi-story projects.

Do you integrate IT and electrical cables during installation?

Our modular workstations feature integrated aluminum raceways. While our team assembles the furniture and provisions the pathways, the final wiring must be executed by your certified IT and electrical contractors.